Briefing on Serrano Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
186 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Serrano Storage is a 186 MW Battery project in Texas, currently active.

Maverick ESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.

Queue ID
ERCOT-24INR0617
Location
Maverick, Texas
Technology
Battery
Developer
Maverick ESS, LLC
Market / region
ERCOT
Point of interconnection
8267 GANSO Substation 138kV

What stands out

1

Serrano Storage is a 186 MW Battery project in Texas with status active.

2

Maverick ESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-12-01.

4

Latest linked story: “Best Project, Energy/Industrial: Serrano Solar & BESS” (ENR, 2025-10-27).

Market and operating context

Queue date
2023-09-23
Proposed COD
2027-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Serrano Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0617
LocationMaverick, Texas
TechnologyBattery
DeveloperMaverick ESS, LLC
Market / regionERCOT
Point of interconnection8267 GANSO Substation 138kV
Queue date2023-09-23
Proposed COD2027-12-01