Briefing/projectactive
Serrano Storage is a 186 MW Battery project in Texas, currently active.
Maverick ESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-01.
- Queue ID
- ERCOT-24INR0617
- Location
- Maverick, Texas
- Technology
- Battery
- Developer
- Maverick ESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- 8267 GANSO Substation 138kV
What stands out
1
Serrano Storage is a 186 MW Battery project in Texas with status active.
2
Maverick ESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-01.
4
Latest linked story: “Best Project, Energy/Industrial: Serrano Solar & BESS” (ENR, 2025-10-27).
Market and operating context
- Queue date
- 2023-09-23
- Proposed COD
- 2027-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.