Query
SEQUOIA
Type
Entity Briefing
Entity
SEQUOIA
Generated
2026-10-13T23:51:41.865Z

Briefing on SEQUOIA

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
400 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2031-01-01
Proposed COD
C13
Queue phase
Briefing/projectactive

SEQUOIA is a 400 MW Solar+Battery project in California, currently active.

The reported queue phase is C13. Proposed COD is 2031-01-01.

Queue ID
CAISO-1792
Location
Tulare, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Vestal Substation 230 kV

What stands out

1

SEQUOIA is a 400 MW Solar+Battery project in California with status active.

2

The reported queue phase is C13; proposed COD is 2031-01-01.

3

Latest linked story: “Pipeline giant Enbridge just lit up its first Texas solar farm” (Electrek, 2025-06-04).

Market and operating context

Queue date
2020-04-15
Proposed COD
2031-01-01
IA status
IA Pending
Study phase
C13
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SEQUOIA — verified asset snapshot

FieldValue
Queue IDCAISO-1792
LocationTulare, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionVestal Substation 230 kV
Queue date2020-04-15
Proposed COD2031-01-01
IA statusIA Pending