SEQUOIA
400 MW hybrid in Tulare, CA · In queue since April 2020 · Proposed COD January 2031
400 MW
Capacity
2
Components
Solar + Battery
6y 7m
In Queue
IA Pending
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10y 9m
Study Phase
C13
Interconnection request submitted to ISO/RTO
Active sheet; IA Filed Unexecuted; C13
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-01-01
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (2 recorded sources)
low confidence at research time
- ceqanet.lci.ca.gov/2026040047
- cleanview.co/power-projects/planned/battery-storage-projects/california/1792_storage/sequoia
Commercial operation date: Only the LBNL filing gives a COD (2031-01-01). The Cleanview listing for Tulare, CA says 'expected to come online in January 2031', but it almost certainly repeats the LBNL date, so I don't count it as independent confirmation. No developer press release or news item gives a different date.
Developer: The LBNL developer field is null. A CEQAnet filing names 'Sequoia Renewables LLC' for a 200 MW PV project, but the snippet doesn't confirm the Tulare County location, so I can't tie it to CAISO-1792. The Enbridge 'Sequoia Solar' results (815 MW, Texas, AT&T/Toyota offtake) are a different project and were excluded.
Status: LBNL lists the project as active with an IA still pending. No source reports withdrawal, an executed IA, or construction.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The SEQUOIA project is a proposed 400 MW hybrid solar and battery energy storage project located in Tulare County, California. The development project consists of 200 MW of solar photovoltaic generation and 200 MW of battery energy storage. It is listed in the CAISO interconnection queue as entry CAISO-1792, with a queue entry date of April 15, 2020. The proposed commercial operation date is January 1, 2031, and the project's interconnection status is currently in the System Impact Study phase.
The SEQUOIA project is interconnected to Southern California Edison (SCE) at the Vestal Substation 230 kV. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Tulare
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Vestal Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- REXFRD_2_RSFBX2-APND
- POI Substation
- Vestal Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.