SEQUOIA (CAISO-1792) — Project Summary

Queue ID
CAISO-1792
Capacity
400 MW
Technology
Solar+Battery
Status
active
Location
Tulare, CA
Region
CAISO
Developer
—
IA Status
IA Pending

SEQUOIA

CAISO-1792BetaActiveSolarBatteryCAISOLBNL + Live

400 MW hybrid in Tulare, CA · In queue since April 2020 · Proposed COD January 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

400 MW

Capacity

2

Components

Solar + Battery

6y 7m

In Queue

IA Pending

IA Phase

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10y 9m

Study Phase

C13

In Study38%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

Active sheet; IA Filed Unexecuted; C13

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-01-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 1, 2031
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue (IA Pending). A possible CEQA permitting filing exists, but it is not confirmed to be this project, and there are no signs of construction.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. ceqanet.lci.ca.gov/2026040047
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/1792_storage/sequoia

Commercial operation date: Only the LBNL filing gives a COD (2031-01-01). The Cleanview listing for Tulare, CA says 'expected to come online in January 2031', but it almost certainly repeats the LBNL date, so I don't count it as independent confirmation. No developer press release or news item gives a different date.

Developer: The LBNL developer field is null. A CEQAnet filing names 'Sequoia Renewables LLC' for a 200 MW PV project, but the snippet doesn't confirm the Tulare County location, so I can't tie it to CAISO-1792. The Enbridge 'Sequoia Solar' results (815 MW, Texas, AT&T/Toyota offtake) are a different project and were excluded.

Status: LBNL lists the project as active with an IA still pending. No source reports withdrawal, an executed IA, or construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SEQUOIA project is a proposed 400 MW hybrid solar and battery energy storage project located in Tulare County, California. The development project consists of 200 MW of solar photovoltaic generation and 200 MW of battery energy storage. It is listed in the CAISO interconnection queue as entry CAISO-1792, with a queue entry date of April 15, 2020. The proposed commercial operation date is January 1, 2031, and the project's interconnection status is currently in the System Impact Study phase.

The SEQUOIA project is interconnected to Southern California Edison (SCE) at the Vestal Substation 230 kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Tulare

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Vestal Substation 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar200 MW · 50%
Battery200 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
REXFRD_2_RSFBX2-APND
POI Substation
Vestal Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.