Briefing on Selenite Springs Solar

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
300 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2028-08-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Selenite Springs Solar is a 300 MW Solar project in Texas, currently active.

Selenite Springs Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-08-30.

Queue ID
ERCOT-29INR0147
Location
Pecos, Texas
Technology
Solar
Developer
Selenite Springs Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching Station

What stands out

1

Selenite Springs Solar is a 300 MW Solar project in Texas with status active.

2

Selenite Springs Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-08-30.

Market and operating context

Queue date
2025-04-21
Proposed COD
2028-08-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Selenite Springs Solar — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0147
LocationPecos, Texas
TechnologySolar
DeveloperSelenite Springs Solar, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching Station
Queue date2025-04-21
Proposed COD2028-08-30