Selenite Springs Solar is a 300 MW Solar project in Texas, currently active.
Selenite Springs Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-08-30.
- Queue ID
- ERCOT-29INR0147
- Location
- Pecos, Texas
- Technology
- Solar
- Developer
- Selenite Springs Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 38355 Leon Creek Switching Station - 38308 Woodhouse Switching Station
What stands out
1
Selenite Springs Solar is a 300 MW Solar project in Texas with status active.
2
Selenite Springs Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-08-30.
Market and operating context
- Queue date
- 2025-04-21
- Proposed COD
- 2028-08-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.