Briefing/projectactive
Scenic Woods BESS is a 10 MW Battery project in ERCOT, currently active.
SMT Houston V LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2027-04-08.
- Queue ID
- ERCOT-25INR0712
- Technology
- Battery
- Developer
- SMT Houston V LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name: SCENIC WOODS_x000D_ TSP Station Code: SW_x000D_ Load Transformer Name: LD5_x000D_ Bus #: 46334_x000D_ Voltage in kV (Transmission Level): 138
What stands out
1
Scenic Woods BESS is a 10 MW Battery project with status active.
2
SMT Houston V LLC is the reported developer.
3
The reported queue phase is In Progress (unknown study); proposed COD is 2027-04-08.
Market and operating context
- Queue date
- 2024-10-10
- Proposed COD
- 2027-04-08
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.