Santa Monica Solar is a 106 MW Solar project in Texas, currently active.
Karol Solar IV is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-20.
- Queue ID
- ERCOT-26INR0228
- Location
- Navarro, Texas
- Technology
- Solar
- Developer
- Karol Solar IV
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 KV 68091 NAVARRO - 3381 BIGBRNW_5 Ckt 2
What stands out
1
Santa Monica Solar is a 106 MW Solar project in Texas with status active.
2
Karol Solar IV is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-20.
4
Latest linked story: “Crescent Dunes: 24 Hours on the Sun” (POWER Magazine, 2016-10-12).
Market and operating context
- Queue date
- 2023-09-07
- Proposed COD
- 2028-09-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters