202 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-04-04
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

SANJAC BESS is a 202 MW Battery project in Texas, currently active.

Castleman Power is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-04-04.

Queue ID
ERCOT-24INR0081
Location
Harris, Texas
Technology
Battery
Developer
Castleman Power
Market / region
ERCOT
Point of interconnection
40270 Riverside 138kV

What stands out

1

SANJAC BESS is a 202 MW Battery project in Texas with status active.

2

Castleman Power is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-04-04.

4

Latest linked story: “Hecate cancels 650MW Staten Island, New York BESS project” (Energy-Storage.News, 2025-10-29).

Market and operating context

Queue date
2021-07-08
Proposed COD
2027-04-04
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SANJAC BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0081
LocationHarris, Texas
TechnologyBattery
DeveloperCastleman Power
Market / regionERCOT
Point of interconnection40270 Riverside 138kV
Queue date2021-07-08
Proposed COD2027-04-04