Briefing/projectactive
SANBORN HYBRID 4 is a 100 MW Solar+Battery project in California, currently active.
The reported queue phase is C13. Proposed COD is 2025-10-01.
- Queue ID
- CAISO-1790
- Location
- Kern, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Windhub Substation 230kV
What stands out
1
SANBORN HYBRID 4 is a 100 MW Solar+Battery project in California with status active.
2
The reported queue phase is C13; proposed COD is 2025-10-01.
3
Latest linked story: “Primergy picks contractors, suppliers for US$1.2bn Gemini solar-plus-storage project in Nevada” (Energy-Storage.News, 2022-03-03).
Market and operating context
- Queue date
- 2020-04-15
- Proposed COD
- 2025-10-01
- IA status
- IA Executed
- Study phase
- C13
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.