Query
SANBORN HYBRID 4
Type
Entity Briefing
Entity
SANBORN HYBRID 4
Generated
2026-10-12T04:16:32.795Z

Briefing on SANBORN HYBRID 4

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
100 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2025-10-01
Proposed COD
C13
Queue phase
Briefing/projectactive

SANBORN HYBRID 4 is a 100 MW Solar+Battery project in California, currently active.

The reported queue phase is C13. Proposed COD is 2025-10-01.

Queue ID
CAISO-1790
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Windhub Substation 230kV

What stands out

1

SANBORN HYBRID 4 is a 100 MW Solar+Battery project in California with status active.

2

The reported queue phase is C13; proposed COD is 2025-10-01.

3

Latest linked story: “Primergy picks contractors, suppliers for US$1.2bn Gemini solar-plus-storage project in Nevada” (Energy-Storage.News, 2022-03-03).

Market and operating context

Queue date
2020-04-15
Proposed COD
2025-10-01
IA status
IA Executed
Study phase
C13
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

SANBORN HYBRID 4 — verified asset snapshot

FieldValue
Queue IDCAISO-1790
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionWindhub Substation 230kV
Queue date2020-04-15
Proposed COD2025-10-01
IA statusIA Executed