SANBORN 5 HYBRID is a 560 MW Solar project in California, currently active.
The reported queue phase is C13. Proposed COD is 2028-04-01.
- Queue ID
- CAISO-1791
- Location
- Kern, California
- Technology
- Solar
- Market / region
- CAISO
- Point of interconnection
- Windhub Substation 230kV
What stands out
1
SANBORN 5 HYBRID is a 560 MW Solar project in California with status active.
2
The reported queue phase is C13; proposed COD is 2028-04-01.
3
Latest linked story: “Terra-Gen puts 129MW/515MWh BESS in operation at California solar PV complex” (Energy-Storage.News, 2026-01-09).
Market and operating context
- Queue date
- 2020-04-15
- Proposed COD
- 2028-04-01
- IA status
- IA Executed
- Study phase
- C13
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.