SANBORN 5 HYBRID (CAISO-1791) — Project Summary

Queue ID
CAISO-1791
Capacity
560.33 MW
Technology
Solar
Status
active
Location
Kern, CA
Region
CAISO
Developer
—
IA Status
IA Executed

SANBORN 5 HYBRID

CAISO-1791BetaActiveSolarCAISOLBNL + Live

560.33 MW generation in Kern, CA · In queue since April 2020 · Proposed COD April 2028

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

560.33 MW

Capacity

1

Components

Solar

6y 7m

In Queue

IA Executed

IA Phase

Signed Sep 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 5m

IA → COD

4y 7m

Total Duration

3y 5m

Study Phase

C13

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementSep 21, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C13

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-04-01

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achievedEnergy-Storage.News · 2026-01-09

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 1, 2028
From queue filing
Developer in saved assessment
Terra-Gen
Status at research time
Active
Active in the CAISO queue with IA executed 2023-09-21; no evidence of construction or operation for this queue entry.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/california/1791_photovoltaic/sanborn-5-hybrid
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/1791_storage/sanborn-5-hybrid
  3. energy-storage.news/officials-in-kern-county-california-begin-permitting-process-for-terra-gens-8gwh-ldes-bess/
  4. interconnection.fyi/project/caiso-1791

Commercial operation date: No developer press release or news article gives a COD for this project. The Cleanview solar listing says 'Expected online 2028', which is consistent with the LBNL date of 2028-04-01 but is an aggregator, not an independent signal. The Cleanview storage listing says 2027.

Developer: The LBNL developer field is null. Terra-Gen is inferred from the Sanborn project name and from Energy-Storage.News coverage of Terra-Gen's Kern County hybrid BESS permitting, but no source explicitly ties Terra-Gen to queue ID 1791. The news-extracted Terra-Gen fact comes from an article about the Lockhart CL I and II BESS (128.7 MW), which is a different project, so it was not used.

Status: LBNL shows active with an executed IA, and aggregator listings (Cleanview, interconnection.fyi, interxdata) still list it as planned or active. The news-extracted 'online' and 'COD achieved' signals concern the Lockhart BESS, not Sanborn 5 Hybrid, and were rejected as a project mismatch.

Project lifecycle
as of 2026-01-09
PhaseOnlineEnergy-Storage.News · 2026-01-09
OperationalYesEnergy-Storage.News · 2026-01-09
TechnologyBatteryEnergy-Storage.News · 2026-01-09
DeveloperTerra-GenEnergy-Storage.News · 2026-01-09
PPA offtakerPacific Gas and Electric (PG&E)Energy-Storage.News · 2026-01-09
COD achievedReportedEnergy-Storage.News · 2026-01-09

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SANBORN 5 HYBRID project is a proposed energy storage project located in Kern County, California, within the CAISO region. The development project, with a total capacity of 574.89 MW, consists entirely of battery storage. The project is interconnected to the Windhub Substation at 230kV.

The project, identified as CAISO-1791 in the CAISO interconnection queue, entered the queue on April 15, 2020, and has a proposed commercial operation date of March 31, 2027. The interconnection agreement (IA) for the project has been executed. The utility is Southern California Edison (SCE).

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Kern

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

Windhub Substation 230kV

Data Source

LBNL + Live

DeveloperTerra-GenEnergy-Storage.News · 2026-01-09
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ALTA6B2_7_N003
POI Substation
Windhub Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.