San Bernard Solar is a 100 MW Solar project in Texas, currently suspended.
Sunchase Power is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2022-01-01.
- Queue ID
- ERCOT-19INR0030
- Location
- Wharton, Texas
- Technology
- Solar
- Developer
- Sunchase Power
- Market / region
- ERCOT
- Point of interconnection
- tap 138kV 43012 New Gulf - 43340 Texas Gulf Sulphur
What stands out
1
San Bernard Solar is a 100 MW Solar project in Texas with status suspended.
2
Sunchase Power is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2022-01-01.
4
Latest linked story: “Aypa Power’s 320 MW Vidal Solar and Energy Project” (Construction Review, 2026-02-06).
Market and operating context
- Queue date
- 2017-01-25
- Proposed COD
- 2022-01-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters