Briefing/projectactive
Saddle Horn Station Solar SLF is a 175 MW Solar+Battery project in Texas, currently active.
Saddle Horn Station LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-11.
- Queue ID
- ERCOT-27INR0351
- Location
- Comanche, Texas
- Technology
- Solar+Battery
- Developer
- Saddle Horn Station LLC
- Market / region
- ERCOT
- Point of interconnection
- 1650 COMANCHE_T8 - 290 SHILOHC 138 kV Line
What stands out
1
Saddle Horn Station Solar SLF is a 175 MW Solar+Battery project in Texas with status active.
2
Saddle Horn Station LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-11.
Market and operating context
- Queue date
- 2024-09-04
- Proposed COD
- 2028-09-11
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.