Query
Saddle Horn Station Solar SLF
Type
Entity Briefing
Entity
Saddle Horn Station Solar SLF
State
CA
Technology
solar
Generated
2026-10-19T16:20:17.268Z

Briefing on Saddle Horn Station Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
175 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2028-09-11
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Saddle Horn Station Solar SLF is a 175 MW Solar+Battery project in Texas, currently active.

Saddle Horn Station LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-11.

Queue ID
ERCOT-27INR0351
Location
Comanche, Texas
Technology
Solar+Battery
Developer
Saddle Horn Station LLC
Market / region
ERCOT
Point of interconnection
1650 COMANCHE_T8 - 290 SHILOHC 138 kV Line

What stands out

1

Saddle Horn Station Solar SLF is a 175 MW Solar+Battery project in Texas with status active.

2

Saddle Horn Station LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-09-11.

Market and operating context

Queue date
2024-09-04
Proposed COD
2028-09-11
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Saddle Horn Station Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0351
LocationComanche, Texas
TechnologySolar+Battery
DeveloperSaddle Horn Station LLC
Market / regionERCOT
Point of interconnection1650 COMANCHE_T8 - 290 SHILOHC 138 kV Line
Queue date2024-09-04
Proposed COD2028-09-11