Rubicon Alpha Wind is a 226 MW Wind project in Texas, currently active.
Throckmorton Wind, is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-07-31.
- Queue ID
- ERCOT-24INR0291
- Location
- Haskell, Texas
- Technology
- Wind
- Developer
- Throckmorton Wind,
- Market / region
- ERCOT
- Point of interconnection
- 60507 pendulo7A 345kV
What stands out
1
Rubicon Alpha Wind is a 226 MW Wind project in Texas with status active.
2
Throckmorton Wind, is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2027-07-31.
Market and operating context
- Queue date
- 2022-05-10
- Proposed COD
- 2027-07-31
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.