Briefing on Royal River BESS

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
311 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Royal River BESS is a 311 MW Battery project in Texas, currently active.

Royal River LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-30.

Queue ID
ERCOT-24INR0282
Location
Brazoria, Texas
Technology
Battery
Developer
Royal River LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 42110 Angleton - 43381 West Columbia

What stands out

1

Royal River BESS is a 311 MW Battery project in Texas with status active.

2

Royal River LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-30.

Market and operating context

Queue date
2022-03-30
Proposed COD
2027-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Royal River BESS — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0282
LocationBrazoria, Texas
TechnologyBattery
DeveloperRoyal River LLC
Market / regionERCOT
Point of interconnectionTap 138kV 42110 Angleton - 43381 West Columbia
Queue date2022-03-30
Proposed COD2027-06-30