Briefing/projectactive
Royal River BESS is a 311 MW Battery project in Texas, currently active.
Royal River LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-30.
- Queue ID
- ERCOT-24INR0282
- Location
- Brazoria, Texas
- Technology
- Battery
- Developer
- Royal River LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 42110 Angleton - 43381 West Columbia
What stands out
1
Royal River BESS is a 311 MW Battery project in Texas with status active.
2
Royal River LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-06-30.
Market and operating context
- Queue date
- 2022-03-30
- Proposed COD
- 2027-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.