Roseland Solar II is a 254 MW Solar project in Texas, currently active.
Hecate Energy is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-11-29.
- Queue ID
- ERCOT-22INR0506
- Location
- Falls, Texas
- Technology
- Solar
- Developer
- Hecate Energy
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 3390 Jewett - 3399 Ratsnake
What stands out
Roseland Solar II is a 254 MW Solar project in Texas with status active.
Hecate Energy is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2025-11-29.
Latest linked story: “Hecate Solar Projects Advance as Repsol Investment Reinforces Hecate's Status as Leading U.S. Renewable Developer” (PR Newswire, 2021-05-21).
Market and operating context
- Queue date
- 2021-10-05
- Proposed COD
- 2025-11-29
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.