Briefing on Rose Quartz BESS

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Rose Quartz BESS is a 101 MW Battery project in Texas, currently active.

Rose Quartz BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.

Queue ID
ERCOT-25INR0133
Location
Dimmit, Texas
Technology
Battery
Developer
Rose Quartz BESS, LLC
Market / region
ERCOT
Point of interconnection
Tap 138kV 8283 Asherton - 8613 Bigwells

What stands out

1

Rose Quartz BESS is a 101 MW Battery project in Texas with status active.

2

Rose Quartz BESS, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-12-01.

Market and operating context

Queue date
2022-09-02
Proposed COD
2026-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rose Quartz BESS — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0133
LocationDimmit, Texas
TechnologyBattery
DeveloperRose Quartz BESS, LLC
Market / regionERCOT
Point of interconnectionTap 138kV 8283 Asherton - 8613 Bigwells
Queue date2022-09-02
Proposed COD2026-12-01