Briefing/projectactive
Rose Quartz BESS is a 101 MW Battery project in Texas, currently active.
Rose Quartz BESS, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-12-01.
- Queue ID
- ERCOT-25INR0133
- Location
- Dimmit, Texas
- Technology
- Battery
- Developer
- Rose Quartz BESS, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 8283 Asherton - 8613 Bigwells
What stands out
1
Rose Quartz BESS is a 101 MW Battery project in Texas with status active.
2
Rose Quartz BESS, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-12-01.
Market and operating context
- Queue date
- 2022-09-02
- Proposed COD
- 2026-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.