Query
ROSAMOND WEST SOLAR
Type
Entity Briefing
Entity
ROSAMOND WEST SOLAR
ISO/RTO
spp
Technology
solar
Generated
2026-10-12T03:19:05.145Z

Briefing on ROSAMOND WEST SOLAR

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
555 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2029-03-31
Proposed COD
C01
Queue phase
Briefing/projectactive

ROSAMOND WEST SOLAR is a 555 MW Solar+Battery project in California, currently active.

The reported queue phase is C01. Proposed COD is 2029-03-31.

Queue ID
CAISO-506
Location
Kern, California
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Whirlwind Substation 230kV

What stands out

1

ROSAMOND WEST SOLAR is a 555 MW Solar+Battery project in California with status active.

2

The reported queue phase is C01; proposed COD is 2029-03-31.

Market and operating context

Queue date
2009-07-31
Proposed COD
2029-03-31
IA status
IA Executed
Study phase
C01
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ROSAMOND WEST SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-506
LocationKern, California
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionWhirlwind Substation 230kV
Queue date2009-07-31
Proposed COD2029-03-31
IA statusIA Executed