ROSAMOND WEST SOLAR
555.3 MW hybrid in Kern, CA · In queue since July 2009 · Proposed COD March 2029
555.3 MW
Capacity
2
Components
Solar + Battery
17y 4m
In Queue
IA Executed
IA Phase
Signed Oct 2014
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
5y 3m
IA → COD
14y 5m
Total Duration
5y 3m
Study Phase
C01
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C01
Project under construction
Typical: 18–30 months
Proposed COD: 2029-03-31
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed per LBNL queue data; the aggregator page lists the project as active.
interconnection.fyiProposed completion date of March 31, 2029 listed in the CAISO queue.
interconnection.fyiResearch sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-506
- cleanview.co/power-projects/planned/solar-farms/california/506_photovoltaic/rosamond-west-solar
- cleanview.co/power-projects/planned/battery-storage-projects/california/506_storage/rosamond-west-solar
Commercial operation date: Only LBNL's proposed COD of 2029-03-31 exists. Aggregator pages (interconnection.fyi, cleanview) repeat the same 2029 date and appear derived from the queue. No developer press release or news article confirms a different date.
Developer: LBNL developer field is null. None of the search results tie Rosamond West Solar to a named developer; the Clearway, Duke, Leeward and Baker Hughes articles concern other projects near Rosamond.
Status: LBNL lists the project as active with an executed IA. Aggregators show it as planned, and no news indicates construction, withdrawal or suspension.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Rosamond West Solar project is a proposed 447.3 MW hybrid solar and battery energy storage project located in Kern County, California. The development project consists of a 299.6 MW solar photovoltaic array coupled with a 147.7 MW battery energy storage system. The project is interconnected to Southern California Edison (SCE) and is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-506, with an original queue entry date of July 31, 2009.
The proposed commercial operation date is March 31, 2029. An Interconnection Agreement (IA) has been executed for the project on August 5, 2020. The point of interconnection (POI) is the Whirlwind Substation at 230kV. The Rosamond West Solar project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kern
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Whirlwind Substation 230kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- ASTORIA2_7_N001
- POI Substation
- Whirlwind Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.