Rocking X Solar is a 602 MW Solar project in Texas, currently active.
7100 Tin Top LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-09-20.
- Queue ID
- ERCOT-23INR0368
- Location
- Parker, Texas
- Technology
- Solar
- Developer
- 7100 Tin Top LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.
What stands out
Rocking X Solar is a 602 MW Solar project in Texas with status active.
7100 Tin Top LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-09-20.
Latest linked story: “Rocking R Solar Farm to go online in 2025, expected to power about 20,000 homes in Louisiana” (KSLA, 2025-04-08).
Market and operating context
- Queue date
- 2023-10-04
- Proposed COD
- 2027-09-20
- IA status
- Facility Study
- Study phase
- Facility Study