Rocking X Solar (ERCOT-23INR0368) — Project Summary

Queue ID
ERCOT-23INR0368
Capacity
602.2 MW
Technology
Solar
Status
active
Location
Parker, TX
Region
ERCOT
Developer
7100 Tin Top LLC
IA Status
Facility Study

Rocking X Solar

ERCOT-23INR0368BetaActiveSolarERCOTLBNL + Live

602.2 MW generation in Parker, TX · In queue since October 2023 · Proposed COD September 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

602.2 MW

Capacity

1

Components

Solar

3y 1m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 11m

Facilities Study50%
Queue EntryOct 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-20

Queue history
23INR0368 · 37 monthly ERCOT reports, Sep 2023 – Sep 2026

Projected COD moved

2 times

Jun 2025 → Sep 2027

Net change

+27 months

first report to latest

Capacity

602 MW

unchanged in the reports

Latest stage

Facilities study done

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 4, 2023
Facilities study approvedSep 25, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

News-reported activity
as of 19 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneexpected to go online · Q2 2025KSLA · 2025-04-08
Expected CODQ2 2025KSLA · 2025-04-08

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 20, 2027
From queue filing
Developer in saved assessment
7100 Tin Top LLC
From queue filing
Status at research time
Active
Active in the ERCOT queue at the Facility Study stage with no executed IA; ercotqueue.com lists build-chance at 1% and no construction or financing signals were found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-23inr0368
  2. ercotqueue.com/project/23INR0368
  3. cleanview.co/power-projects/planned/solar-farms/texas/23INR0368/rocking-x-solar
  4. app.nrgmap.com/queues/ercot-23inr0368

Commercial operation date: Only the LBNL/ERCOT proposed COD of 2027-09-20 exists for this project. Cleanview's 'Expected online 2027' and interconnection.fyi's September 2027 date appear to be mirrors of the queue data, not independent developer guidance. The KSLA 'Q2 2025' COD describes Rocking R Solar in Caddo Parish, Louisiana, a different project, and was excluded.

Developer: Every source that names a developer for Rocking X Solar lists 7100 Tin Top LLC, and no parent or operating company was found. The news-extracted DESRI / D.E. Shaw attribution comes from articles about Rocking R Solar in Louisiana (SWEPCO PPA), so it was not applied here.

Status: LBNL, interconnection.fyi, and NRG Map all show the queue position as active, and ercotqueue.com shows no IA. No evidence of construction, withdrawal, or suspension was found.

Project lifecycle
as of 2025-04-08
PhaseConstructionKSLA · 2025-04-08
OperationalNoKSLA · 2025-04-08
TechnologySolarKSLA · 2025-04-08
DeveloperDESRIKSLA · 2025-04-08
PPA offtakerSWEPCOKSLA · 2025-04-08

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Rocking X Solar is a proposed 602.2 MW solar generation project located in Parker County, Texas. The developer is 7100 Tin Top LLC. The project is currently active in the ERCOT interconnection queue as entry ERCOT-23INR0368, with a queue entry date of October 4, 2023, and a proposed commercial operation date of September 20, 2027. Its interconnection agreement status is currently in the Facility Study phase.

The point of interconnection is planned to tap the 345 kV Parker Switch to Comanche Peak SES double-circuit line, Circuit 1. The Rocking X Solar project has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Parker

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

7100 Tin Top LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#1900) Double-Circuit line, Circuit 1.

Data Source

LBNL + Live

DeveloperDESRI±KSLA · 2025-04-08
TransactionPPAKSLA · 2022-09-21
OfftakerSWEPCOKSLA · 2022-09-21
PPA structurePhysicalKSLA · 2022-09-21
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Comanche

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.