Briefing on Riviera Gas

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
942 MW
Proposed capacity
active
Current status
Gas
Technology
ERCOT
Market / region
2030-06-14
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Riviera Gas is a 942 MW Gas project in Texas, currently active.

BKV-BPP Power is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2030-06-14.

Queue ID
ERCOT-29INR0206
Location
Bell, Texas
Technology
Gas
Developer
BKV-BPP Power
Market / region
ERCOT
Point of interconnection
3413 KNOB CREEK SWITCH SUBSTATION 345kV

What stands out

1

Riviera Gas is a 942 MW Gas project in Texas with status active.

2

BKV-BPP Power is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2030-06-14.

4

Latest linked story: “Powering Florida” (Site Selection Magazine, 2024-11-03).

Market and operating context

Queue date
2025-11-05
Proposed COD
2030-06-14
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Riviera Gas — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0206
LocationBell, Texas
TechnologyGas
DeveloperBKV-BPP Power
Market / regionERCOT
Point of interconnection3413 KNOB CREEK SWITCH SUBSTATION 345kV
Queue date2025-11-05
Proposed COD2030-06-14