Briefing on Riverhead Solar 2

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
36 MW
Proposed capacity
active
Current status
Solar
Technology
NYISO
Market / region
2027-01-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Riverhead Solar 2 is a 36 MW Solar project in New York, currently active.

Riverhead Solar 2, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-01-01.

Queue ID
NYISO-535
Location
Suffolk, New York
Technology
Solar
Developer
Riverhead Solar 2, LLC
Market / region
NYISO
Point of interconnection
Edwards 138kV

What stands out

1

Riverhead Solar 2 is a 36 MW Solar project in New York with status active.

2

Riverhead Solar 2, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-01-01.

Market and operating context

Queue date
2016-02-23
Proposed COD
2027-01-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Riverhead Solar 2 — verified asset snapshot

FieldValue
Queue IDNYISO-535
LocationSuffolk, New York
TechnologySolar
DeveloperRiverhead Solar 2, LLC
Market / regionNYISO
Point of interconnectionEdwards 138kV
Queue date2016-02-23
Proposed COD2027-01-01