Briefing/projectactive
RIVERBEND SOLAR SLF is a 302 MW Solar+Battery project in Texas, currently active.
Riverbend Renewables, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-12-31.
- Queue ID
- ERCOT-25INR0297
- Location
- Falls, Texas
- Technology
- Solar+Battery
- Developer
- Riverbend Renewables, LLC
- Market / region
- ERCOT
- Point of interconnection
- TAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3412) SUBSTATIONS
What stands out
1
RIVERBEND SOLAR SLF is a 302 MW Solar+Battery project in Texas with status active.
2
Riverbend Renewables, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-12-31.
Market and operating context
- Queue date
- 2023-03-08
- Proposed COD
- 2027-12-31
- IA status
- Facility Study
- Study phase
- Facility Study