Briefing/projectactive
Fierce River Solar is a 896 MW Solar+Battery project in Texas, currently active.
Rio Grande Solar LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-02-22.
- Queue ID
- ERCOT-27INR0221
- Location
- Starr, Texas
- Technology
- Solar+Battery
- Developer
- Rio Grande Solar LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345 kV 80355 Del Sol - 80119 Frontera Ckt 1
What stands out
1
Fierce River Solar is a 896 MW Solar+Battery project in Texas with status active.
2
Rio Grande Solar LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-02-22.
Market and operating context
- Queue date
- 2024-03-22
- Proposed COD
- 2029-02-22
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.