Briefing on 18-BRAVO BESS

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
407 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-02-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

18-BRAVO BESS is a 407 MW Battery project in Texas, currently active.

Scout Energy Management, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-02-01.

Queue ID
ERCOT-28INR0327
Location
Hunt, Texas
Technology
Battery
Developer
Scout Energy Management, LLC
Market / region
ERCOT
Point of interconnection
138 kV Commerce Switch Substation. Bus no. #1816

What stands out

1

18-BRAVO BESS is a 407 MW Battery project in Texas with status active.

2

Scout Energy Management, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-02-01.

Market and operating context

Queue date
2025-04-01
Proposed COD
2028-02-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

18-BRAVO BESS — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0327
LocationHunt, Texas
TechnologyBattery
DeveloperScout Energy Management, LLC
Market / regionERCOT
Point of interconnection138 kV Commerce Switch Substation. Bus no. #1816
Queue date2025-04-01
Proposed COD2028-02-01