Query
Red Dirt Solar
Type
Entity Briefing
Entity
Red Dirt Solar
Generated
2026-10-14T00:19:58.809Z

Briefing on Red Dirt Solar

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
153 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
Southeast
Market / region
2026-09-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Red Dirt Solar is a 153 MW Solar+Battery project in Georgia, currently active.

The reported queue phase is Facility Study. Proposed COD is 2026-09-30.

Queue ID
GTC-GI-172
Location
Talbot, Georgia
Technology
Solar+Battery
Market / region
Southeast
Point of interconnection
Patsiliga Creek - Talbot County #1 230 kV

What stands out

1

Red Dirt Solar is a 153 MW Solar+Battery project in Georgia with status active.

2

The reported queue phase is Facility Study; proposed COD is 2026-09-30.

Market and operating context

Queue date
2023-04-06
Proposed COD
2026-09-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Red Dirt Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-172
LocationTalbot, Georgia
TechnologySolar+Battery
Market / regionSoutheast
Point of interconnectionPatsiliga Creek - Talbot County #1 230 kV
Queue date2023-04-06
Proposed COD2026-09-30
IA statusFacility Study