Briefing on Rebecca Solar

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
120 MW
Proposed capacity
active
Current status
Solar
Technology
Southeast
Market / region
2028-12-01
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

Rebecca Solar is a 120 MW Solar project in Georgia, currently active.

The reported queue phase is System Impact Study. Proposed COD is 2028-12-01.

Queue ID
GTC-GI-199
Location
Turner, Georgia
Technology
Solar
Market / region
Southeast
Point of interconnection
North Tifton - Pitts 230 kV line

What stands out

1

Rebecca Solar is a 120 MW Solar project in Georgia with status active.

2

The reported queue phase is System Impact Study; proposed COD is 2028-12-01.

Market and operating context

Queue date
2024-12-11
Proposed COD
2028-12-01
IA status
System Impact Study
Study phase
System Impact Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Rebecca Solar — verified asset snapshot

FieldValue
Queue IDGTC-GI-199
LocationTurner, Georgia
TechnologySolar
Market / regionSoutheast
Point of interconnectionNorth Tifton - Pitts 230 kV line
Queue date2024-12-11
Proposed COD2028-12-01
IA statusSystem Impact Study