Rebecca Solar is a 120 MW Solar project in Georgia, currently active.
The reported queue phase is System Impact Study. Proposed COD is 2028-12-01.
- Queue ID
- GTC-GI-199
- Location
- Turner, Georgia
- Technology
- Solar
- Market / region
- Southeast
- Point of interconnection
- North Tifton - Pitts 230 kV line
What stands out
1
Rebecca Solar is a 120 MW Solar project in Georgia with status active.
2
The reported queue phase is System Impact Study; proposed COD is 2028-12-01.
Market and operating context
- Queue date
- 2024-12-11
- Proposed COD
- 2028-12-01
- IA status
- System Impact Study
- Study phase
- System Impact Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.