Rapidan Hydro Facility is a 7 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Out of service.
Rapidan Hydro Facility is reported in Minnesota since 1984 under Eagle Creek Renewable Energy, LLC. Available operating and financial measures include 1.6% capacity factor and 1 GWh annual generation; $2294/kW reported CapEx.
- Location
- Blue Earth, Minnesota
- Technology
- Conventional Hydroelectric
- Owner / parent
- Eagle Creek Renewable Energy, LLC
- Operator
- Eagle Creek Renewable Energy, LLC
- Grid
- MISO (Midcontinent)
- Plant ID
- 52054
What stands out
Rapidan Hydro Facility is a 7 MW Conventional Hydroelectric asset in Minnesota with status Out of service.
Latest annual operating measures report 1.6% capacity factor and 1 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- MRO
- State rank
- #10 of 23
- National rank
- #778 of 1,462
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.