6.8 MW Hydro out of service in Blue Earth, MN
6.8 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1984
Operating Since
Coordinates
44.0927, -94.1088
County
Blue Earth, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eagle Creek Renewable Energy, LLC | — | — |
| Owner(s) | Rapidan Hydroelectric, LLC | — | — |
| Status | Out of service | — | — |
The Rapidan Hydro Facility is a 6.8 MW hydroelectric power plant located in Blue Earth County, Minnesota. It began operating in 1984 and is owned and operated by Eagle Creek Renewable Energy, LLC. The plant utilizes conventional hydroelectric technology and consists of two generators.
The facility's primary fuel source is water (WAT). It operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the MRO NERC region. In its most recent year of operation, the Rapidan Hydro Facility generated 928 MWh of electricity, achieving a capacity factor of 1.6%. The plant ranks as the 11th largest hydroelectric facility in Minnesota out of 24, and 781st nationally out of 1464 similar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
58 MWh
Latest Month
928 MWh
Annual Generation
1.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $15.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.RAPIDA1
Pricing Hub
MINN.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Rapidan Hydro FacilityForward forecasts, scenario decomposition, and risk-decision tooling for this asset.