Query
Rancho Grande Solar queue pipeline — 1 projects by technology and status
Type
Entity Briefing
Entity
Muy Grande Solar
ISO/RTO
isone
Generated
2026-10-19T14:25:33.671Z

Briefing on Muy Grande Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
503 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-05-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Muy Grande Solar is a 503 MW Solar project in Texas, currently active.

ACE DevCo NC, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-05-15.

Queue ID
ERCOT-28INR0043
Location
Starr, Texas
Technology
Solar
Developer
ACE DevCo NC, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 80079 Cruce - 80355 Del Sol

What stands out

1

Muy Grande Solar is a 503 MW Solar project in Texas with status active.

2

ACE DevCo NC, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-05-15.

Market and operating context

Queue date
2024-01-11
Proposed COD
2029-05-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Muy Grande Solar — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0043
LocationStarr, Texas
TechnologySolar
DeveloperACE DevCo NC, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 80079 Cruce - 80355 Del Sol
Queue date2024-01-11