Muy Grande Solar (ERCOT-28INR0043) — Project Summary

Queue ID
ERCOT-28INR0043
Capacity
502.69 MW
Technology
Solar
Status
active
Location
Starr, TX
Region
ERCOT
Developer
ACE DevCo NC, LLC
IA Status
Facility Study

Muy Grande Solar

ERCOT-28INR0043BetaActiveSolarERCOTLBNL + Live

502.69 MW generation in Starr, TX · In queue since January 2024 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

502.69 MW

Capacity

1

Components

Solar

2y 10m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 4m

Facilities Study50%
Queue EntryJan 11, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-15

Queue history
28INR0043 · 14 monthly ERCOT reports, Aug 2025 – Sep 2026

Projected COD moved

1 time

May 2028 → May 2029

Net change

+12 months

first report to latest

Capacity

503 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJan 11, 2024

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 15, 2029
From queue filing
Developer in saved assessment
ACE DevCo NC, LLC
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage; no IA executed and no public construction or financing signals found.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-28inr0043
  2. cleanview.co/power-projects/planned/solar-farms/texas/28INR0043/muy-grande-solar

Commercial operation date: Only the LBNL filing gives a specific COD (2029-05-15). Aggregator sites (interconnection.fyi, cleanview.co) repeat it as 'Expected online 2029', but they derive from the same queue data and are not independent. No developer press release or news item gives a different date.

Developer: Only the LBNL filing entity, ACE DevCo NC, LLC, is named, and interconnection.fyi repeats it. No press release or news result identifies a parent or operating company, so the shell-vs-parent relationship can't be resolved.

Status: LBNL lists the project as active with a Facility Study IA status. Aggregators agree it is active/planned, and nothing in the search results contradicts this.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Muy Grande Solar is a proposed 502.69-megawatt (MW) solar generation project located in Starr County, Texas. The development project is being pursued by ACE DevCo NC, LLC and consists of a single solar photovoltaic component accounting for the full 502.69 MW of capacity. The project is planned to connect to the grid via a tap on the 345 kV transmission line between the Cruce (80079) and Del Sol (80355) substations.

The project is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-28INR0043, which it entered on January 11, 2024. Its status in the queue is active, and it has reached the Facility Study stage of the interconnection process. The proposed commercial operation date is May 15, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Starr

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

ACE DevCo NC, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 80079 Cruce - 80355 Del Sol

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.