Quarter Ranch Solar is a 154 MW Solar Photovoltaic asset in ERCOT (Texas), currently Planned.
Quarter Ranch Solar is reported in Texas under Gransolar Texas Three, LLC. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Webb, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Gransolar Texas Three, LLC
- Operator
- Gransolar Texas Three, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 67078
What stands out
Quarter Ranch Solar is a 154 MW Solar Photovoltaic asset in Texas with status Planned.
Available financial measures include $1543/kW CapEx.
Latest linked story: “Lydian Energy Secures $689M Financing for Solar and Battery Storage Projects” (Construction Owners Club, 2026-03-09).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #196 of 378
- National rank
- #527 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.