Briefing on PSE Gongora Hill TX Storage

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2028-06-30
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

PSE Gongora Hill TX Storage is a 200 MW Battery project in Texas, currently active.

PureSky Development Inc is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.

Queue ID
ERCOT-24INR0446
Location
Starr, Texas
Technology
Battery
Developer
PureSky Development Inc
Market / region
ERCOT
Point of interconnection
Tap 138kV 8796 Roma – 7870 Escobares

What stands out

1

PSE Gongora Hill TX Storage is a 200 MW Battery project in Texas with status active.

2

PureSky Development Inc is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-06-30.

Market and operating context

Queue date
2023-02-27
Proposed COD
2028-06-30
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

PSE Gongora Hill TX Storage — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0446
LocationStarr, Texas
TechnologyBattery
DeveloperPureSky Development Inc
Market / regionERCOT
Point of interconnectionTap 138kV 8796 Roma – 7870 Escobares
Queue date2023-02-27
Proposed COD2028-06-30