Briefing on Prattsburgh Wind Farm

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
147 MW
Proposed capacity
active
Current status
Wind
Technology
NYISO
Market / region
2027-09-01
Proposed COD
System Impact Study
Queue phase
Briefing/projectactive

Prattsburgh Wind Farm is a 147 MW Wind project in New York, currently active.

Prattsburgh Wind, LLC is the reported developer. The reported queue phase is System Impact Study. Proposed COD is 2027-09-01.

Queue ID
NYISO-801
Location
Steuben, New York
Technology
Wind
Developer
Prattsburgh Wind, LLC
Market / region
NYISO
Point of interconnection
Stoney Ridge - Canadaigua 230kV

What stands out

1

Prattsburgh Wind Farm is a 147 MW Wind project in New York with status active.

2

Prattsburgh Wind, LLC is the reported developer.

3

The reported queue phase is System Impact Study; proposed COD is 2027-09-01.

4

Latest linked story: “State Approves Erecting 36 Wind Turbines in Steuben County” (Finger Lakes Daily News, 2024-09-25).

Market and operating context

Queue date
2019-02-21
Proposed COD
2027-09-01
IA status
System Impact Study
Study phase
System Impact Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Prattsburgh Wind Farm — verified asset snapshot

FieldValue
Queue IDNYISO-801
LocationSteuben, New York
TechnologyWind
DeveloperPrattsburgh Wind, LLC
Market / regionNYISO
Point of interconnectionStoney Ridge - Canadaigua 230kV
Queue date2019-02-21
Proposed COD2027-09-01