147 MW generation in Steuben, NY · In queue since February 2019 · Proposed COD September 2027
147 MW
Capacity
1
Components
Wind
7y 5m
In Queue
System Impact Study
IA Phase
Signed Jan 2023
Queue → IA
3y 11m
IA → COD
4y 8m
Total Duration
3y 11m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–36 months
Proposed COD: 2027-09-01
System Impact Study initiated per LBNL queue data
New York State Office of Renewable Energy Siting approved erecting 36 wind turbines in Steuben County
sourceThe Prattsburgh Wind Farm is a proposed 147 MW wind energy project located in Steuben County, New York. Developed by Prattsburgh Wind, LLC, the project is interconnected to the NYSEG utility and is currently active in the NYISO interconnection queue as entry NYISO-801, with a queue entry date of February 21, 2019. The proposed commercial operation date is December 1, 2025. Its interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Stoney Ridge - Canadaigua 230kV line.
The Prattsburgh Wind Farm development has been the subject of recent news coverage, with six articles categorized as four industry-related and two regulatory-related.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Steuben
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Prattsburgh Wind, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Stoney Ridge - Canadaigua 230kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE B
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26