Briefing/projectactive
Prairie Branch Solar is a 301 MW Solar+Battery project in Texas, currently active.
Prairie Branch Solar is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.
- Queue ID
- ERCOT-28INR0422
- Location
- Montague, Texas
- Technology
- Solar+Battery
- Developer
- Prairie Branch Solar
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV #1730 Krum West - #6111 Riley Ckt 1
What stands out
1
Prairie Branch Solar is a 301 MW Solar+Battery project in Texas with status active.
2
Prairie Branch Solar is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-01.
Market and operating context
- Queue date
- 2025-09-09
- Proposed COD
- 2029-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.