Prairie Blossom Storage is a 123 MW Battery project in Texas, currently active.
Prairie Blossom Storage, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-21.
- Queue ID
- ERCOT-27INR0323
- Location
- Howard, Texas
- Technology
- Battery
- Developer
- Prairie Blossom Storage, LLC
- Market / region
- ERCOT
- Point of interconnection
- 1322 Big Spring 138kV
What stands out
Prairie Blossom Storage is a 123 MW Battery project in Texas with status active.
Prairie Blossom Storage, LLC is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-09-21.
Latest linked story: “471MW Mockingbird Solar Center in Texas, the US” (NS Energy, 2023-04-07).
Market and operating context
- Queue date
- 2024-12-19
- Proposed COD
- 2028-09-21
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.