Briefing on Pradera Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
118 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pradera Solar is a 118 MW Solar+Battery project in Texas, currently active.

Pradera Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-03-31.

Queue ID
ERCOT-24INR0056
Location
Webb, Texas
Technology
Solar+Battery
Developer
Pradera Solar, LLC
Market / region
ERCOT
Point of interconnection
tap 345 kV Lobo (80219) - Fowlerton (5709)

What stands out

1

Pradera Solar is a 118 MW Solar+Battery project in Texas with status active.

2

Pradera Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-03-31.

Market and operating context

Queue date
2021-07-08
Proposed COD
2027-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pradera Solar — verified asset snapshot

FieldValue
Queue IDERCOT-24INR0056
LocationWebb, Texas
TechnologySolar+Battery
DeveloperPradera Solar, LLC
Market / regionERCOT
Point of interconnectiontap 345 kV Lobo (80219) - Fowlerton (5709)
Queue date2021-07-08
Proposed COD2027-03-31