Briefing on Pouch Energy Storage System

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
47 MW
Proposed capacity
active
Current status
Battery
Technology
NYISO
Market / region
2028-12-01
Proposed COD
C24
Queue phase
Briefing/projectactive

Pouch Energy Storage System is a 47 MW Battery project in New York, currently active.

the NY Power Authority is the reported developer. The reported queue phase is C24. Proposed COD is 2028-12-01.

Queue ID
NYISO-C24-333
Location
Kings, New York
Technology
Battery
Developer
the NY Power Authority
Market / region
NYISO
Point of interconnection
Fox Hills 138kV Substation

What stands out

1

Pouch Energy Storage System is a 47 MW Battery project in New York with status active.

2

the NY Power Authority is the reported developer.

3

The reported queue phase is C24; proposed COD is 2028-12-01.

Market and operating context

Queue date
2024-10-09
Proposed COD
2028-12-01
Study phase
C24

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pouch Energy Storage System — verified asset snapshot

FieldValue
Queue IDNYISO-C24-333
LocationKings, New York
TechnologyBattery
Developerthe NY Power Authority
Market / regionNYISO
Point of interconnectionFox Hills 138kV Substation
Queue date2024-10-09
Proposed COD2028-12-01