Pouch Energy Storage System (NYISO-C24-333) — Project Summary

Queue ID
NYISO-C24-333
Capacity
47.1 MW
Technology
Battery
Status
active
Location
Kings, NY
Region
NYISO
Developer
the NY Power Authority
IA Status

Pouch Energy Storage System

NYISO-C24-333BetaActiveBatteryNYISOLBNL + Live

47.1 MW storage in Kings, NY · In queue since October 2024 · Proposed COD December 2030

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

47.1 MW

Capacity

1

Components

Battery

1y 7m

In Queue

IA Status

COD target: 2030

Interconnection

Total Duration

6y 2m

Pre-Study0%
Queue EntryOct 9, 2024

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-01

Risk Analytics

Forward-looking exposure analytics for this queue project — climate hazards, expected generation variability, counterparty risk — into a single decision-grade view. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability
Counterparty exposure
About

The Pouch Energy Storage System is a proposed 47.1 MW battery storage project located in Kings County, New York. The developer is the NY Power Authority, and the project is interconnected with ConEd. It is listed in the NYISO interconnection queue as entry NYISO-C24-333, with a queue entry date of October 9, 2024, and a proposed commercial operation date of December 1, 2030.

The project is currently listed as active in the interconnection queue. The point of interconnection is the Fox Hills 138kV Substation. The proposed project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

NY

County

Kings

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

the NY Power Authority

Utility

ConEd

Entity

NYISO

Service Type

Point of Interconnection

Fox Hills 138kV Substation

Data Source

LBNL + Live

Generation Forecast

Forward-looking generation outlook for this queue project with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year horizon (through 2034)
P10 / P50 / P90 confidence bands
Weather + policy + demand scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this queue project, projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE J
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No Ask reports yet for this entity.

Ask about Pouch Energy Storage System
InfraSure platform