Post Wind Farm LP is a 84 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.
Post Wind Farm LP is reported in Texas since 2006 under NextEra Energy. Available operating and financial measures include 42.7% capacity factor and 315 GWh annual generation; $1895/kW reported CapEx.
- Location
- Borden, Texas
- Technology
- Onshore Wind Turbine
- Owner / parent
- NextEra Energy
- Operator
- FPL Energy Red Canyon LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 56457
What stands out
Post Wind Farm LP is a 84 MW Onshore Wind Turbine asset in Texas with status Operating.
Latest annual operating measures report 42.7% capacity factor and 315 GWh annual generation.
Available financial measures include $1895/kW CapEx.
Latest linked story: “NextEra Energy ranked No. 1 in its industry on Fortune's list of 'World's Most Admired Companies'” (NextEra Energy Newsroom, 2025-01-30).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #215 of 252
- National rank
- #806 of 1,442
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.