Query
Post Wind Farm LP
Type
Entity Briefing
Entity
Post Wind Farm LP
Generated
2026-09-21T20:10:03.032Z

Briefing on Post Wind Farm LP

Entity Briefing
Generated Sep 21, 2026·Dataset freshness not reported
84 MW
Capacity
Operating
Current status
2006
Operating since
1
Generators
42.7%
Capacity factor
315 GWh
Annual generation
Briefing/plantOperating

Post Wind Farm LP is a 84 MW Onshore Wind Turbine asset in ERCOT (Texas), currently Operating.

Post Wind Farm LP is reported in Texas since 2006 under NextEra Energy. Available operating and financial measures include 42.7% capacity factor and 315 GWh annual generation; $1895/kW reported CapEx.

Location
Borden, Texas
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
FPL Energy Red Canyon LLC
Grid
ERCOT (Texas)
Plant ID
56457

What stands out

1

Post Wind Farm LP is a 84 MW Onshore Wind Turbine asset in Texas with status Operating.

2

Latest annual operating measures report 42.7% capacity factor and 315 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “NextEra Energy ranked No. 1 in its industry on Fortune's list of 'World's Most Admired Companies'” (NextEra Energy Newsroom, 2025-01-30).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#215 of 252
National rank
#806 of 1,442

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.