Briefing/projectactive
Enfinity Post Oak Storage SLF is a 0 MW Battery project in Texas, currently active.
EG White Oak LLC is the reported developer. Proposed COD is 2029-12-18.
- Queue ID
- ERCOT-29INR0292
- Location
- Borden, Texas
- Technology
- Battery
- Developer
- EG White Oak LLC
- Market / region
- ERCOT
- Point of interconnection
- 345kV Long Draw (59900) to Sand Bluff (59902) Transmission line
What stands out
1
Enfinity Post Oak Storage SLF is a 0 MW Battery project in Texas with status active.
2
EG White Oak LLC is the reported developer.
3
proposed COD is 2029-12-18.
Market and operating context
- Queue date
- 2026-03-30
- Proposed COD
- 2029-12-18
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.