Enfinity Post Oak Storage SLF (ERCOT-29INR0292) — Project Summary

Queue ID
ERCOT-29INR0292
Capacity
—
Technology
Battery
Status
active
Location
Borden, TX
Region
ERCOT
Developer
EG White Oak LLC
IA Status
—

Enfinity Post Oak Storage SLF

ERCOT-29INR0292BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

— hybrid in Borden, TX · In queue since March 2026 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

—

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryMar 30, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-18

Queue history
29INR0292 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

0 times

Dec 2029 → Dec 2029

Net change

0 months

first report to latest

Capacity

0 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 30, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Enfinity Post Oak Storage SLF (queue ID ERCOT-29INR0292) is a proposed battery energy storage development project in Borden County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The developer is EG White Oak LLC. The project is classified as a hybrid, combining a battery energy storage component with a second component listed as "Other." The available data does not specify the total capacity or the capacities of the individual components.

The project entered the ERCOT interconnection queue on March 30, 2026, and its queue status is active. It has a proposed commercial operation date of December 18, 2029. The project would connect to the grid at the 345 kV Muleshoe point of interconnection (bus 59922) on a transmission line. The available data does not report the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Borden

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

EG White Oak LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

345kV Muleshoe (59922) Transmission line

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.