Briefing/projectactive
Pinnington Storage is a 503 MW Solar+Battery project in Texas, currently active.
Hecate Energy Longhorn Storage LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-04-20.
- Queue ID
- ERCOT-24INR0011
- Location
- Jack, Texas
- Technology
- Solar+Battery
- Developer
- Hecate Energy Longhorn Storage LLC
- Market / region
- ERCOT
- Point of interconnection
- tap both 345kV 1430 Graham - 1436 Parker 345kV lines
What stands out
1
Pinnington Storage is a 503 MW Solar+Battery project in Texas with status active.
2
Hecate Energy Longhorn Storage LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-04-20.
Market and operating context
- Queue date
- 2020-12-03
- Proposed COD
- 2029-04-20
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.