Entity
Pinnacle Point Energy Storage
Generated
2026-10-19T17:29:27.164Z

Briefing on Pinnacle Point Energy Storage

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
101 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2027-06-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Pinnacle Point Energy Storage is a 101 MW Battery project in Texas, currently active.

GCI Pinnacle Point, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-06-01.

Queue ID
ERCOT-26INR0317
Location
Harris, Texas
Technology
Battery
Developer
GCI Pinnacle Point, LLC
Market / region
ERCOT
Point of interconnection
Tap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV

What stands out

1

Pinnacle Point Energy Storage is a 101 MW Battery project in Texas with status active.

2

GCI Pinnacle Point, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2027-06-01.

4

Latest linked story: “DOE conditionally commits to $1.8B loan guarantee for Arizona Public Service” (Utility Dive, 2025-01-09).

Market and operating context

Queue date
2023-11-14
Proposed COD
2027-06-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Pinnacle Point Energy Storage — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0317
LocationHarris, Texas
TechnologyBattery
DeveloperGCI Pinnacle Point, LLC
Market / regionERCOT
Point of interconnectionTap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV
Queue date2023-11-14
Proposed COD2027-06-01