PEREGRINE BESS is a 150 MW Solar+Battery project in Texas, currently active.
CED Development Inc. is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-07-01.
- Queue ID
- ERCOT-23INR0206
- Location
- Goliad, Texas
- Technology
- Solar+Battery
- Developer
- CED Development Inc.
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 8624 Grissom - 8164 Coleto Creek
What stands out
PEREGRINE BESS is a 150 MW Solar+Battery project in Texas with status active.
CED Development Inc. is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-07-01.
Latest linked story: “Arevon completes US$258 million financing for 200MW/400MWh San Diego BESS” (Energy-Storage.News, 2025-02-26).
Market and operating context
- Queue date
- 2021-02-10
- Proposed COD
- 2027-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.