Query
Padua 2
Type
Entity Briefing
Entity
Padua 2
Generated
2026-10-17T10:39:45.145Z

Briefing on Padua 2

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
150 MW
Capacity
Under construction
Current status
1
Generators
Briefing/plantUnder construction

Padua 2 is a 150 MW Batteries asset in ERCOT (Texas), currently Under construction.

Padua 2 is reported in Texas under Padua 2. Available operating and financial measures include $1361/kW reported CapEx.

Location
Bexar, Texas
Technology
Batteries
Owner / parent
Padua 2
Operator
Padua 2
Grid
ERCOT (Texas)
Plant ID
68913

What stands out

1

Padua 2 is a 150 MW Batteries asset in Texas with status Under construction.

2

Available financial measures include $1361/kW CapEx.

3

1 linked queue projects represent 151 MW of proposed capacity.

4

Latest linked story: “2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.” (San Antonio Express-News, 2026-01-16).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#119 of 344
National rank
#266 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Padua 2 — verified asset snapshot

FieldValue
LocationBexar, Texas
TechnologyBatteries
Owner / parentPadua 2
OperatorPadua 2
GridERCOT (Texas)
Plant ID68913
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.