Padua 2 is a 150 MW Batteries asset in ERCOT (Texas), currently Under construction.
Padua 2 is reported in Texas under Padua 2. Available operating and financial measures include $1361/kW reported CapEx.
- Location
- Bexar, Texas
- Technology
- Batteries
- Owner / parent
- Padua 2
- Operator
- Padua 2
- Grid
- ERCOT (Texas)
- Plant ID
- 68913
What stands out
Padua 2 is a 150 MW Batteries asset in Texas with status Under construction.
Available financial measures include $1361/kW CapEx.
1 linked queue projects represent 151 MW of proposed capacity.
Latest linked story: “2021 winter storm exposed grid weakness; part of Texas’ solution is being built near S.A.” (San Antonio Express-News, 2026-01-16).
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #119 of 344
- National rank
- #266 of 994
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.