Query
Padrino Solar
Type
Entity Briefing
Entity
Padrino Solar
Generated
2026-10-20T04:20:59.577Z

Briefing on Padrino Solar

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
201 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-10-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Padrino Solar is a 201 MW Solar project in Texas, currently active.

TotalEnergies is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-10-01.

Queue ID
ERCOT-25INR0166
Location
Hill, Texas
Technology
Solar
Developer
TotalEnergies
Market / region
ERCOT
Point of interconnection
Tap 345kV 68090 Sam Switch – 3389 Fort Smith

What stands out

1

Padrino Solar is a 201 MW Solar project in Texas with status active.

2

TotalEnergies is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-10-01.

Market and operating context

Queue date
2022-09-15
Proposed COD
2026-10-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Padrino Solar — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0166
LocationHill, Texas
TechnologySolar
DeveloperTotalEnergies
Market / regionERCOT
Point of interconnectionTap 345kV 68090 Sam Switch – 3389 Fort Smith
Queue date2022-09-15
Proposed COD2026-10-01