Query
Overton Hydroelectric Project
Type
Entity Briefing
Entity
Overton Hydroelectric Project
State
VT
Technology
hydro
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on Overton Hydroelectric Project

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

49 MW
Capacity
Planned
Current status
6
Generators
Briefing/plantPlanned

Overton Hydroelectric Project is a 49 MW Conventional Hydroelectric asset in MISO (Midcontinent), currently Planned.

Overton Hydroelectric Project is reported in Louisiana under Rye Development. Available operating and financial measures include $1415/kW reported CapEx.

Location
Rapides, Louisiana
Technology
Conventional Hydroelectric
Owner / parent
Rye Development
Operator
Rye Development
Grid
MISO (Midcontinent)
Plant ID
62391

What stands out

1

Overton Hydroelectric Project is a 49 MW Conventional Hydroelectric asset in Louisiana with status Planned.

2

Available financial measures include $1415/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
SERC
State rank
#2 of 2
National rank
#305 of 1,462

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Overton Hydroelectric Project — verified asset snapshot

FieldValue
LocationRapides, Louisiana
TechnologyConventional Hydroelectric
Owner / parentRye Development
OperatorRye Development
GridMISO (Midcontinent)
Plant ID62391
ISO / marketMISO (Midcontinent)
Balancing authorityMidcontinent Independent Transmission System Operator, Inc..