48.6 MW Hydro planned in Rapides, LA
48.6 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
Planned: —
Planned Operation
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Rye Development | Rye Development | — |
| Owner(s) | Rye Development | Red River Hydro LLC | — |
| Status | Planned | announced | — |
GEM identifies the owner as Red River Hydro LLC
This entity is not yet in the GEM ownership database — chain unavailable.
The Overton Hydroelectric Project is a 48.6 MW hydroelectric power plant located in Rapides County, Louisiana. It is owned and operated by Rye Development. The plant utilizes conventional hydroelectric technology and is fueled by water (WAT). Overton has 6 generators.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the SERC NERC region. Overton Hydroelectric Project is the second-largest hydroelectric plant in Louisiana (out of 2) and ranks 308th nationally among 1464 hydroelectric facilities.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,415/kW
Est. Construction Cost
Total estimated cost: $68.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
LOUISIANA.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Overton Hydroelectric ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.